Cleanroom process

OUR
Design-Build
SERVICES

Step to Design-Build project

01.

PRELIMINARY ENGINEERING FOR BUDGETARY QUOTE

The pre-engineering process allows us to create a budgeted quotation for your cleanroom project by specifying your needs and objectives, rules and regulations, classification, general technical requirements and other requirements. CAPT's one-stop service starts with our team of technical experts on planning and designing your clean room: ceilings, doors, floors, mechanical systems, HVAC systems, and more, all areas assessed. By working in a wide range of cleanroom projects, sizes and applications, our experienced team can advise you on the best layout classification requirements according to your Carry out your work or help you develop

02.

ENGINEERING & DESIGN

Start with your needs (User-specific requirements) The CAPT will design your cleanroom and go through the design (DQ) to make sure it meets your requirements. The elements considered during the design process include: clean room dimensions, door and window position, fresh air through a HEPA / ULPA filter, positive or negative pressure; The required amount of air changes per hour, temperature demand, relative humidity, special lighting, etc., a CAPT mechanical engineer can guide you through the HVAC system, whether it is a CAPT HVAC installation or system integration. Third party system The engineering, design and planning process ends with the approval of clean room details and HVAC project drawings.

03.

MANUFACTURING AND CONSTRUCTION

The CAPT modular cleanroom is built with the engineered CAPT modular control panel, which is manufactured in our factory under an ISO 9001 certified quality assurance system and then Put together Manufacturing of modular components in a regulated environment of our plant allows us to manufacture and guarantee product quality and on-time delivery. Unlike some cleanroom manufacturers, we control every step of the cleanroom production and engineering processes, allowing us to guarantee the performance of our products.

04.

SHIPPING & INSTALLATION

CAPTs come in two options: they can be pre-assembled and pre-assembled on-site, or the cleanroom can be fully pre-assembled at a CAPT factory and delivered to your site.CAPT ships anywhere in Thailand. While most of our projects are in Thailand and Laos We have delivered and installed the project to Laos. And neighboring countries, the CAPT arrange for installation with its own qualifications, no matter where in the world you will need to install a clean room. The major advantages of our pre-designed panels during the installation process are reduced off-site risks and overall installation time. Once the installation is complete, the CAPT team will be qualified to install (IQ) to ensure the cleanroom is installed correctly and that it meets the intended design requirements.CAPT

There are two options: they can be pre-assembled and pre-assembled on-site, or the cleanroom can be fully pre-assembled at a CAPT factory and delivered to your site.CAPT ships anywhere in Thailand. While most of our projects are in Thailand and Laos We have delivered and installed the project to Laos. And neighboring countries, the CAPT arrange for installation with its own qualifications, no matter where in the world you will need to install a clean room. The major advantages of our pre-designed panels during the installation process are reduced off-site risks and overall installation time. Once the installation is complete, the CAPT team will be qualified to install (IQ) to ensure the cleanroom is installed correctly and that it meets the intended design requirements.

05.

COMMISSIONING, PRE-CERTIFICATION, PRE-VALIDATION & DOCUMENTATION

In addition to mounting the panels, the CAPT ensures that the cleanroom works properly. As part of the commissioning phase, the CAPT performs a thorough cleanroom test to verify that it will perform the purpose and design specifications. With the cleanroom in operation, we balance pressure, check temperature, control, check air volume, speed and consistency. To make sure everything works perfectly, our technicians use a tool to check the number of airborne particles, the number of air changes per hour, the pressure in the room, etc. Accurate in advance 6-7-8-9) along with ensuring the cleanroom works according to the original design. (Performance Qualification: OQ) Pre-certification is performed in a fixed procedure. (Also known as during breaks): Go up and work with equipment and machines. But no personnel Complete documentation also comes with every panel specification, HEPA certificate, warranty, spare parts list, maintenance manual.

Cleanroom คลีนรูม

Proud to Support Our Local Community.

CLEAN AIR PRODUCT is proud to assist customers with consultations on CLEANROOM, both Design, Build and Install. Consult free of charge.